Investments mobilized by the project
Results of the first tender on buildings
Reducing energy consumption by over 60%, reducing energy costs for the municipalities of more than 11%, investments by the ESCo winner of over 2.9 million.
These are the numbers of the first tender organized within the project 2020Together for the energy improvement and management of 18 buildings owned by five municipalities of the Metropolitan City of Torino.
Wall insulation, replacement of windows, new central heating systems and installation of photovoltaic systems are some of the interventions that BOSCH ENERGY&SOLUTIONS will realize within a year at his own expense, by application of the EPC (Energy Performance Contracting), upgrading the energy efficiency of the public buildings of the Municipalities of Bruino, None, Orbassano, Piossasco and Volvera.
In the tables below, for each Municipality involved, are summarized the proposed interventions:
Bruino
Energy savings |
61,5 % |
Overallcost savings
|
15,94 % |
Value of the proposed investments
|
€ 467.209 |
Replacement of windows
|
134 sqm |
Wall insulation
|
1.534 sqm of insulation of walls + 130 mc of blowed insulation material |
Covers' insulation
|
1.981 sqm |
New thermal power plant
|
690 kW |
Solar thermal plant |
not foreseen
|
Photovoltaic system |
10,5 kWp |
Remote management and thermoregulation
|
yes |
|
Name |
Marinella Primary School |
Year of construction
|
1973 |
Heated floor area |
674 sqm |
Gross heated volume
|
1.934 mc |
Interventions proposed
|
Replacement of windows, wall insulation, covers' insulation, new thermal power plant, photovoltaic system, remote management and thermoregulation |
|
Name |
Primary School |
Year of construction
|
1980 |
Heated floor area |
1.037 sqm |
Gross heated volume
|
3.736 mc |
Interventions proposed
|
Covers' insulation, new thermal power plant, remote management and thermoregulation |
|
Name |
Aldo Moro Middle School |
Year of construction
|
anni '60 |
Heated floor area |
3.290 sqm |
Gross heated volume
|
10.085 mc |
Interventions proposed
|
Blowed insulation material, covers' insulation, new thermal power plant, remote management and thermoregulation |
|
Name |
City Hall |
Year of construction
|
'800 |
Heated floor area |
1.035 sqm |
Gross heated volume
|
4.796 mc |
Interventions proposed
|
Blowed insulation material, covers' insulation, new thermal power plant, remote management and thermoregulation |
|
Name |
Gymnasium Aldo Moro Middle School |
Year of construction
|
anni '60 |
Heated floor area |
1.007 sqm |
Gross heated volume
|
7.825 mc |
Interventions proposed
|
Wall insulation, new thermal power plant, remote management and thermoregulation |
None
Energy savings |
61,7 % |
Overall cost savings
|
29,5 % |
Value of the proposed investments
|
€ 42.648 |
Replacement of windows
|
not foreseen
|
Wall insulation
|
not foreseen
|
Covers' insulation
|
not foreseen
|
New thermal power plant
|
160 kW |
Solar thermal plant |
not foreseen
|
Photovoltaic system |
not foreseen
|
Remote management and thermoregulation
|
yes |
|
Name |
Rubiano kindergarten
|
Year of construction
|
years '70-'80 |
Heated floor area |
1.440 sqm |
Gross heated volume
|
5.911 mc |
Interventions proposed
|
New thermal power plant, remote management and thermoregulation |
Orbassano
Energy savings |
58,2 % |
Overall cost savings
|
16,25 % |
Value of the proposed investments
|
835.727 |
Replacement of windows
|
60 sqm |
Wall insulation
|
6.013 sqm of insulation of walls + 267 mc of blowed insulation material |
Covers' insulation
|
not foreseen
|
New thermal power plant
|
1.060 kW |
Solar thermal plant |
20 sqm |
Photovoltaic system |
not foreseen
|
Remote management and thermoregulation
|
yes |
|
Name |
Fermi Primary School |
Year of construction
|
1980 |
Heated floor area |
5.604 sqm |
Gross heated volume
|
21.452 mc |
Interventions proposed
|
Blowed insulation material, new thermal power plant, remote management and thermoregulation |
|
Name |
Gymnasium Neghelli |
Year of construction
|
1970 |
Heated floor area |
524 sqm |
Gross heated volume
|
3.004 mc |
Interventions proposed
|
New thermal power plant, solar thermal plant, remote management and thermoregulation |
|
Name |
Pavese Primary School + Andersen kindergarden |
Year of construction
|
1980 |
Heated floor area |
5.160 sqm |
Gross heated volume
|
20.961 mc |
Interventions proposed
|
Replacement of windows, wall insulation, solar thermal plant, remote management and thermoregulation |
|
Name |
Rodari Primary School |
Year of construction
|
1980 |
Heated floor area |
2.291 sqm |
Gross heated volume
|
9.076 mc |
Interventions proposed
|
Wall insulation, new thermal power plant, remote management and thermoregulation |
Piossasco
Energy savings |
63,4 % |
Overall cost savings
|
2,07 % |
Value of the proposed investments
|
€ 464.284 |
Replacement of windows
|
83 sqm |
Wall insulation
|
2.300 sqm of insulation of walls
|
Covers' insulation
|
1.120 sqm |
New thermal power plant
|
814 kW |
Solar thermal plant |
20 sqm |
Photovoltaic system |
10 kWp |
Remote management and thermoregulation
|
yes |
|
Name |
Andersen kindergarten |
Year of construction
|
1981 |
Heated floor area |
549 sqm |
Gross heated volume
|
2.263 mc |
Interventions proposed
|
Replacement of windows, wall insulation, covers' insulation, new thermal power plant, solar thermal plant, photovoltaic system, remote management and thermoregulation |
|
Name |
Cruto Middle School |
Year of construction
|
School construction 1976 - gymnasium construction 1983 |
Heated floor area |
3.455 sqm |
Gross heated volume
|
15.874 mc |
Interventions proposed
|
Wall insulation, covers' insulation, new thermal power plant, remote management and thermoregulation |
|
Name |
Montessori kindergarten |
Year of construction
|
2006 |
Heated floor area |
1225 sqm |
Gross heated volume
|
5680 mc |
Interventions proposed
|
Wall insulation, new thermal power plant, solar thermal plant, remote management and thermoregulation |
Volvera
Energy savings |
63,7 % |
Overall cost savings
|
6,75 % |
Value of the proposed investments
|
1.151.365 |
Replacement of windows
|
210 sqm |
Wall insulation
|
3.449 sqm of insulation of walls
|
Covers' insulation
|
3.000 sqm |
New thermal power plant
|
1.330 kW |
Solar thermal plant |
10 sqm |
Photovoltaic system |
20 kWp |
Remote management and thermoregulation
|
yes |
|
Name |
Don Balbiano Primary School |
Year of construction
|
1960-1966 |
Heated floor area |
1.366 sqm |
Gross heated volume
|
6.387 mc |
Interventions proposed
|
Replacement of windows, wall insulation, covers' insulation, new thermal power plant, remote management and thermoregulation |
|
Name |
Don Milani kindergarten |
Year of construction
|
1972-1973 |
Heated floor area |
658 mq |
Gross heated volume
|
3.069 mc |
Interventions proposed
|
Replacement of windows, wall insulation, covers' insulation, new thermal power plant, photovoltaic system, remote management and thermoregulation |
|
Name |
Primo Levi Primary School |
Year of construction
|
1979 |
Heated floor area |
1.291 sqm |
Gross heated volume
|
5.000 mc |
Interventions proposed
|
Wall insulation, covers' insulation, new thermal power plant, remote management and thermoregulation |
|
Name |
Campana Middle School |
Year of construction
|
1977 |
Heated floor area |
3.318 sqm |
Gross heated volume
|
14.906 mc |
Interventions proposed
|
Wall insulation, covers' insulation, new thermal power plant, remote management and thermoregulation |
|
Name |
Rodari kindergarten |
Year of construction
|
1973-1974 |
Heated floor area |
1.496 sqm |
Gross heated volume
|
6.376 mc |
Interventions proposed
|
Replacement of windows, wall insulation, covers' insulation, new thermal power plant, solar thermal plant, photovoltaic system, remote management and thermoregulation |
REVAMPING 2 - City of Torino
The action Revamping 2 has been implemented as part of 2020Together project and it represents an example of a massive technological operation of renovation of thermal power plants on a group of about 118 municipal buildings through the signing of an energy performance contract with Iren Servizi e Innovazione.
The contract includes: the installation of high efficiency boilers and burners; the acquisition and installation of thermostatic valves for a part of the buildings; the management of the installations until 31.12.2020. The remuneration of supplies and services made by the executive body is expected through the payment of an annual fee based on the achievement of a performance threshold guaranteed savings in terms of energy needs of 10% of consumption previously registered (baseline).