Investments mobilized by the project

logo 2020together 88 logo iee vertical en 88

 

Results of the first tender on buildings

Reducing energy consumption by over 60%, reducing energy costs for the municipalities of more than 11%, investments by the ESCo winner of over 2.9 million.


These are the numbers of the first tender organized within the project 2020Together for the energy improvement and management of 18 buildings owned by five municipalities of the Metropolitan City of Torino.


Wall insulation, replacement of windows, new central heating systems and installation of photovoltaic systems are some of the interventions that BOSCH ENERGY&SOLUTIONS will realize within a year at his own expense, by application of the EPC (Energy Performance Contracting), upgrading the energy efficiency of the public buildings of the Municipalities of Bruino, None, Orbassano, Piossasco and Volvera.


In the tables below, for each Municipality involved, are summarized the proposed interventions:

Bruino  

bruino 750x500
Energy savings 61,5 %
Overallcost savings 15,94 %
Value of the proposed investments € 467.209
Replacement of windows 134 sqm
Wall insulation 1.534 sqm of insulation of walls + 130 mc of blowed insulation material
Covers' insulation 1.981 sqm
New thermal power plant 690 kW
Solar thermal plant not foreseen
Photovoltaic system 10,5 kWp
Remote management and thermoregulation yes
bruino marinella Name Marinella Primary School
Year of construction 1973
Heated floor area 674 sqm
Gross heated volume 1.934 mc
Interventions proposed Replacement of windows, wall insulation, covers' insulation, new thermal power plant, photovoltaic system, remote management and thermoregulation
bruino infanzia Name Primary School
Year of construction 1980
Heated floor area 1.037 sqm
Gross heated volume 3.736 mc
Interventions proposed Covers' insulation, new thermal power plant, remote management and thermoregulation
bruino aldo moro Name Aldo Moro Middle School
Year of construction anni '60
Heated floor area 3.290 sqm
Gross heated volume 10.085 mc
Interventions proposed Blowed insulation material, covers' insulation, new thermal power plant, remote management and thermoregulation
bruino municipio Name City Hall
Year of construction '800
Heated floor area 1.035 sqm
Gross heated volume 4.796 mc
Interventions proposed Blowed insulation material, covers' insulation, new thermal power plant, remote management and thermoregulation
bruino palestra Name Gymnasium Aldo Moro Middle School
Year of construction anni '60
Heated floor area 1.007 sqm
Gross heated volume 7.825 mc
Interventions proposed Wall insulation, new thermal power plant, remote management and thermoregulation 

None  

none 750x500
Energy savings 61,7 %
Overall cost savings 29,5 %
Value of the proposed investments € 42.648
Replacement of windows not foreseen
Wall insulation not foreseen
Covers' insulation not foreseen
New thermal power plant 160 kW
Solar thermal plant not foreseen
Photovoltaic system not foreseen
Remote management and thermoregulation yes
none rubiano Name Rubiano kindergarten
Year of construction years '70-'80
Heated floor area 1.440 sqm
Gross heated volume 5.911 mc
Interventions proposed New thermal power plant, remote management and thermoregulation 

Orbassano  

orbassano 750x500
Energy savings 58,2 %
Overall cost savings 16,25 %
Value of the proposed investments 835.727
Replacement of windows 60 sqm
Wall insulation 6.013 sqm of insulation of walls + 267 mc of blowed insulation material
Covers' insulation not foreseen
New thermal power plant 1.060 kW
Solar thermal plant 20 sqm
Photovoltaic system not foreseen
Remote management and thermoregulation yes
orbassano fermi Name Fermi Primary School
Year of construction 1980
Heated floor area 5.604 sqm
Gross heated volume 21.452 mc
Interventions proposed Blowed insulation material, new thermal power plant, remote management and thermoregulation
orbassano palestra neghelli Name Gymnasium Neghelli
Year of construction 1970
Heated floor area 524 sqm
Gross heated volume 3.004 mc
Interventions proposed New thermal power plant, solar thermal plant, remote management and thermoregulation 
orbassano pavese Name Pavese Primary School + Andersen kindergarden
Year of construction 1980
Heated floor area 5.160 sqm
Gross heated volume 20.961 mc
Interventions proposed Replacement of windows, wall insulation, solar thermal plant, remote management and thermoregulation 
orbassano rodari Name Rodari Primary School
Year of construction 1980
Heated floor area 2.291 sqm
Gross heated volume 9.076 mc
Interventions proposed Wall insulation, new thermal power plant, remote management and thermoregulation 

Piossasco  

piossasco 750x500
Energy savings 63,4 %
Overall cost savings 2,07 %
Value of the proposed investments € 464.284
Replacement of windows 83 sqm
Wall insulation 2.300 sqm of insulation of walls
Covers' insulation 1.120 sqm
New thermal power plant 814 kW
Solar thermal plant 20 sqm
Photovoltaic system 10 kWp
Remote management and thermoregulation yes
piossasco andersen Name Andersen kindergarten
Year of construction 1981
Heated floor area 549 sqm
Gross heated volume 2.263 mc
Interventions proposed Replacement of windows, wall insulation, covers' insulation, new thermal power plant, solar thermal plant, photovoltaic system, remote management and thermoregulation 
piossasco cruto Name Cruto Middle School
Year of construction School construction 1976 - gymnasium construction 1983
Heated floor area 3.455 sqm
Gross heated volume 15.874 mc
Interventions proposed Wall insulation, covers' insulation, new thermal power plant, remote management and thermoregulation 
piossasco montessori Name Montessori kindergarten
Year of construction 2006
Heated floor area 1225 sqm
Gross heated volume 5680 mc
Interventions proposed Wall insulation, new thermal power plant, solar thermal plant, remote management and thermoregulation 

Volvera  

volvera 750x500
Energy savings 63,7 %
Overall cost savings 6,75 %
Value of the proposed investments 1.151.365
Replacement of windows 210 sqm
Wall insulation 3.449 sqm of insulation of walls
Covers' insulation 3.000 sqm
New thermal power plant 1.330 kW
Solar thermal plant 10 sqm
Photovoltaic system 20 kWp
Remote management and thermoregulation yes
volvera don balbiano Name Don Balbiano Primary School
Year of construction 1960-1966
Heated floor area 1.366 sqm
Gross heated volume 6.387 mc
Interventions proposed Replacement of windows, wall insulation, covers' insulation, new thermal power plant, remote management and thermoregulation 
volvera don milani Name Don Milani kindergarten
Year of construction 1972-1973
Heated floor area 658 mq
Gross heated volume 3.069 mc
Interventions proposed Replacement of windows, wall insulation, covers' insulation, new thermal power plant, photovoltaic system, remote management and thermoregulation 
volvera primo levi Name Primo Levi Primary School
Year of construction 1979
Heated floor area 1.291 sqm
Gross heated volume 5.000 mc
Interventions proposed Wall insulation, covers' insulation, new thermal power plant, remote management and thermoregulation 
volvera campana Name Campana Middle School
Year of construction 1977
Heated floor area 3.318 sqm
Gross heated volume 14.906 mc
Interventions proposed Wall insulation, covers' insulation, new thermal power plant, remote management and thermoregulation 
volvera rodari Name Rodari kindergarten
Year of construction 1973-1974
Heated floor area 1.496 sqm
Gross heated volume 6.376 mc
Interventions proposed Replacement of windows, wall insulation, covers' insulation, new thermal power plant, solar thermal plant, photovoltaic system, remote management and thermoregulation 
 
REVAMPING 2 - City of Torino

The action Revamping 2 has been implemented as part of 2020Together project and it represents an example of a massive technological operation of renovation of thermal power plants on a group of about 118 municipal buildings through the signing of an energy performance contract with Iren Servizi e Innovazione. The contract includes: the installation of high efficiency boilers and burners; the acquisition and installation of thermostatic valves for a part of the buildings; the management of the installations until 31.12.2020. The remuneration of supplies and services made by the executive body is expected through the payment of an annual fee based on the achievement of a performance threshold guaranteed savings in terms of energy needs of 10% of consumption previously registered (baseline).